װ??Ӣ?ķ???

核心提示1、 produced a first floor ceiling to install the construction process, site management and technical staff found that ma

1、 produced a first floor ceiling to install the construction process, site management and technical staff found that many duct close to the ceiling angle, so that the air supply duct of the vibration generated in the process will cause the ceiling shaking, I company managers to staff the report, your company requested our bracket for the ceiling to install anti-huang, my company's technical staff with experience in the actual circumstances and after their visit to believe that such anti-huang bracket installation solve the shock has no real meaning, please design staff and management to /confirm/i. If you must install the anti-huang bracket, please provide specific installation program of your company.

2 、production of the first floor of the building as part of the region due to placement of equipment and space management and other reasons, have made significant adjustments to my company's progress and construction programs have had a great impact. Please charge will change on the first floor at this stage is summarized, and the preparation of information and the delivery of our drawings in order to facilitate the latter part of our construction schedule and program adjustments.

3、 production of the first floor of the east of the main entrance of the building, as well as the southwest corner of the door cover problems, while the first floor of the east elevator office is required to produce steel structure, and requested the management of the construction program as soon as possible to pay on our side.

4 、because of design problems (wind pipe 3.6, ceiling 3.4), resulting in insufficient space to install the keel, though by your company coordinate and solve some problems, but the whole duct still a lot of problems in the construction process in our company has repeatedly found that many Regional mechanical and electrical side also unable to adjust. Please your company to address and solve this problem.

Thanks

问题一:装修工人英文怎么说 Decoration workers

问题二:装修工的英文是什么 fitment worker

问题三:装修工用英语怎么说 装修工 fitment worker

做小买卖的(小贩) packman

做首饰的技工 jewelry artisan

收棉花辣椒的?这也算“职业名称”么? 其实还是小贩。

平盯种地兼打短工的(其实也就是农民工了)peasant workers或migrant workers 如果是特指离开土地打“短工”,可以说 short off-farm worker

问题四:装修工人, 英语怎么讲 fitment worker

问题五:内装修工程英文怎么写 内装修工程

[词典] interior finish work;

[例句]年内,建造工程及装修工程进入顶峰期。

Construction and fit-out work entered its most intensive phase during the year.

问题六:“我的爸爸是装修工人”的英语句子怎么说 My father is a decoration worker.

问题七:建筑装修工程英语怎么说? Architectural decoration project

问题八:XP会不会比98更加充分的发挥硬件的性能,从而使游戏运行更顺畅? 作为服役十余年的系统,它已经迎来了自己的归宿。现在,全世界的网友不禁为这一顽强存在于microsoft十余载的系统肃然起敬。只有不断地探索、尝试、创新,才能使系统运行更人性化。这一点,是XP无法与7和8.1相媲美的。

问题九:请问“装饰工程有限公司”用英语怎么说?谢谢 Decoration Engineering Co. Ltd.

装饰 虽然有形容词 decor揣tive,但在公司名字里,更适合用名词形式 decoration,即名词定语。

问题十:请问装修、装修队、装修工程怎么翻译? 我是美国设计师的翻译,美国人装修矗fit out 装修公司是fit out pany,至于装修队(fit out team)和装修工程(fit out project)我就不确定了,你可以自己研究研究

 
友情链接
鄂ICP备19019357号-22